Bajo Del Choique Field Development
Can we discuss your project needs?
Bajo Del Choique Field Development
F&C Engineers provided conceptual engineering, budgeting, FEED,process, civil, structural, mechanical, I&E, controls & automation, 100% modularized.
Equipment included: Wellhead production separators, production manifolds, pig launchers and receivers, Inlet slug catcher, inlet separators, oil heater treaters and desalters, inlet metering, filter Coalescers, 11 compressors, outlet Coalescers, TEG Glycol Dehydration, after scrubber, fuel gas skid, LACT Units, hot oil heater, bulk storage, VRU, MCC, solar power generation and remote glycol heat tracing.
Project Details
LOCATION:
Rincon de los Sauces, Neuquén, Argentina
PROJECT TYPE
PRODUCTION:
138 MMSCFD and 60 KBOPD field production from 96 Wells in 16 different well production pads. Gathering System encompassing entire Field. Central Production Facility, with (5) engine driven generators, pigging, metering, oil treating and handling, compression, dehydration, fuel gas capabilities and bulk storage.