150MMSCFD Compressor Station

Can we discuss your project needs?

150MMSCFD Compressor Station

Producers Midstream, LP (“PMLP”) awarded F&C Engineers the design of a 60 MMSCFD Cryogenic Processing Plant. The new facility will be a natural gas gathering system and up to 260 million cubic feet per day (MMscfd) of cryogenic processing capacity (“The System”) in the Western Delaware Basin through the formation of Culberson Midstream LLC. The System is anchored by more than 40,000 net dedicated acres and a 1,000 square mile area of mutual interest from Charger Shale Oil Company (“Charger”). Culberson Midstream, operated by PMLP, will provide Delaware Basin producers with competitive midstream solutions for gas, oil and water.Equipment Includes:

  • Pig Launchers and Receivers
  • Slug Catcher
  • Inlet Separator
  • Condensate Stabilizer
  • Overhead Compression
  • Molecular Sieve Dehydration
  • Molecular Sieve Regeneration
  • Mechanical Refrigeration System
  • Cold Separator
  • Cryo Unit
  • Turbo Expander/Compressor
  • Hot Oil System
  • Residue Compression
  • MCC
  • Utilities
  • Flare Knock-Out Skid
  • Flare

Project Details

LOCATION:

Mentone, TX

PROJECT TYPE
PRODUCTION:

Train 1-100 MMSCFD Train 2- 50MMSCCFD 10 (Train 1) and 5 (Train 2) / Waukesha 7044 GSI / Ariel JGK-4

Project Gallery

Contact Us Today