150 MMSCDF Cryogenic Gas Processing Plant (Eagle Ford)

Project Details

LOCATION:

Eagle Ford Shale

OPERATOR:

Boardwalk

PROJECT TYPE

F&C Engineers provided complete engineering design, detailed construction drawings and construction supervision for a cryogenic gas processing plant. Gas flow design rate is 150 MMSCDF and by-products produced are NGL’s at 18,000 bpd. Plant equipment is supported on a variety of foundations: octagonal, spread, mat, waffle slab and drilled shafts to depths 12 – 40 feet below grade. Dynamic analysis on compressor block foundations was conducted to ensure no resonance occurred.

Equipment Includes: 

Pipe Line Pumps and Storage

Cryo Plant,

Amine Plant

Residue Gas Compressors

Flare, Motor Control Center

Control Room

Dehydration/Regeneration

DeMethanizer

JT Plant

DeEthanizer

Refrigeration

Utilities

Thermal Oxidize

Pipe Line Pumps and Storage