FEED / Detailed Engineering: 2025 -2026 Project Details LOCATION: Terre Haute, IN PROJECT TYPE: Pyrolysis Process PRODUCTION: Heavy Oil / Light Oil / Carbon Black Equipment: Furnace / Retort skid, designed to process raw tire chips (internal temperature of 800-1000°F). Loading skids. Finished product storage tanks. Electrical gear. Control System (PLC-based). BOP equipment. Services: FEED […]
Category Archives: Industrial
EPC Refrigerants unloading / Storage Facility Project Details LOCATION: Harris, TX PRODUCTION: Refrigerants PROJECT TYPE EPC:2022-2023 EQUIPMENT: Refrigerants liquid high capacity storage vessels, control/ MCC, electronic tank scales, truck loading/unloading, refrigerant recovery system, vacuum system, fire & gas detection system. SERVICES: EPC- Civil, Structural, Mechanical, Electrical, and instrumentation engineering design, Construction, and Commissioning



