Project Details LOCATION: Brazil OPERATOR: Petroserv PROJECT TYPE F&C Engineers designed a complete crude oil processing facility module for Petrobas that includes gas handling, condensate handling, separation, and filtration for shipboard production. This 1,100 ton module is capable of producing 30,000 bopd and 17 MMSCDF gas. It includes full oil, condensate, water, and gas separation and treating. F&C Engineers provided 3D designs of all […]
Author Archives: fandc_wpadmin
Project Details LOCATION: Rincon de los Sauces, Neuquén, Argentina PRODUCTION: 138 MMSCDF and 60 KBOPD field production from 96 Wells in 16 different well production pads. Gathering System encompassing entire Field. Central Production Facility, with (5) engine driven generators, pigging, metering, oil treating and handling, compression, dehydration, fuel gas capabilities and bulk storage. PROJECT TYPE […]
Project Details LOCATION: Bay De Chene, Louisiana OPERATOR: Swift Energy PROJECT TYPE F&C Engineers provided detailed engineering for the addition of a new barge mounted 8,000 bopd, 10,000 bwpd, 33MMSCDF grassroots facility for Swift Energy, including water injection and barge loading terminal. Innovative foundation design minimized piles, excavation and rock fill. Process system design, flow […]
Project Details LOCATION: Anelo, Neuquén Province, Argentina PRODUCTION: 40 MMSCDF / 563 BOPD / 4,000 BWPD from 3 Pilot Wells PROJECT TYPE F&C Engineers provided mechanical, structural, instrumentation, controls and automation engineering design,detailed construction drawings and fabrication support. Equipment included: HP, LP and Test Separator Skids, Fuel Gas Skid, Glycol Inlet Coalescing Filter, Glycol Afterscrubber
Project Details LOCATION: Wolf Camp, Texas OPERATOR: EP Energy PROJECT TYPE F&C Engineers provided complete project management, engineering, and procurement support for the development of a new standardized Centralized Processing Facility for gathering production from up to 27 wells. A number of these standardized facilities are being installed to develop a large West Texas leased […]






