Author Archives: fandc_wpadmin

LM2500 Trailer Gen Set (GE)

Project Details LOCATION: Arkansas, USA PROJECT TYPE Turbomachinery OPERATOR: Arkansas Electric Coop F&C Engineers provided complete design/fabrication and turnkey supply of turbine and generator sub bases, sound attenuated engine enclosure for 85 db noise requirement and engine mount hardware for the 20 MW gen sets. FCE worked with trailer supplier to specify layout and load […]

Elliott Gas Turbine Driven Compressor Package

Project Details PROJECT TYPE Turbomachinery F&C Engineers is pleased to announce Elliott Group awards the Design and Production of a gas turbine driven compressor package to be installed in the marine environment of an FPSO. This package is designed for accepting a driver in the 40,000 Hp range geared to a compressor for reinjection/export service.

CO2 Gas Turbine Packages (Brazil)

Project Details LOCATION: Brazil PROJECT TYPE Turbomachinery OPERATOR/OEM: Dresser-Rand Dresser-Rand awards Engineering Design and Fabrication of ten (10) CO2 Gas Turbine Packages to F&C Engineers.  The inlet filter housing units will be located on four (4) “replicant” floating, production, storage and offloading (FPSO) ships being built for Petrobas’ Pre Salt project in the Lula field […]

35 MMSCFD Amine and Acid Gas Injection (Permian)

Project Details LOCATION: Mitchell County, Tx PRODUCTION 35 MMSCFD PROJECT TYPE EQUIPMENT: Inlet separation, Inlet acid gas compressor, filtration, 350 gpm amine plant, hot oil system, TEG dehydration, filters, TEG after scrubber, acid gas injection compressor, measurement, sour liquid storage, PDC building, MV/LV transformers, VRU compressor, thermal oxidizers, flare, RO system, compressed air system, tank […]

15 MMSCFD Nitrogen Rejection Processing Plant (Eagle Ford)

Project Details LOCATION: Edna, TX PRODUCTION: 15 MMSCFD of gas containing N2, H2S and CO2 PROJECT TYPE F&C provided discipline engineering design, detailed construction drawings and construction supervision NOTE: Foundations include: Octagonal, Spread, Mat, Waffle Slab, and drilled shafts to depths 12-40 ft. below grade. Dynamic Analysis on compressor block foundations was conducted. Equipment Included: