Project Details
PROJECT TYPE
Turbomachinery
Concept Design for 8 x 30 MW GE TM2500+ Mobile units
FCE Provided:
- General Arrangement for equipment items in multiple configurations.Â
- Cost estimating
- Install much of the usual land based infrastructure on the barges for rapid set-up
- Fuel storage in hull
- Each turbine gen set may be moved off the barge and relocated
- Scalable to any size plant


