150MMSCFD Cryogenic Gas Processing Plant

PROJECT: Cryogenic Gas Processing Plant
LOCATION: Eagle Ford Shale
OPERATOR: Boardwalk

F&C Engineers provided complete engineering design, detailed construction drawings and construction supervision for a cryogenic gas processing plant. Gas flow design rate is 150 MMSCFD and by-products produced are NGL’s at 18,000 bpd. Plant equipment is supported on a variety of foundations: octagonal, spread, mat, waffle slab and drilled shafts to depths 12 - 40 feet below grade. Dynamic analysis on compressor block foundations was conducted to ensure no resonance occurred.

Equipment Includes: 

  • Cryo Plant,
  • Amine Plant
  • Residue Gas Compressors
  • Flare, Motor Control Center
  • Control Room
  • Dehydration/Regeneration
  • DeMethanizer
  • JT Plant
  • DeEthanizer
  • Refrigeration
  • Utilities
  • Thermal Oxidize
  • Pipe Line Pumps and Storage

 




About F&C Engineers

F&C Engineers provides full services from concept to start up for the oil & gas gathering and midstream industries, upstream and power generation industries. We serve our clients globally with more than 30 years of industry experience. Our staff of multi-disciplinary professionals can assess, solve, plan, budget, design and construct ingenious solutions to complex projects. Utilizing proprietary state-of-the-art technology, F&C delivers unmatched quality, budgets and schedules adding value to our client's return on investment.